post
Skip to main content

Which actions are required to take stock of metrological equipment?


 

Start with a thorough inventory. Then identify each item of equipment by assigning a code based on a pre-defined system that prevents two systems from being misidentified. Then fill in an equipment data sheet similar to the examples included in the documents FD X 07-016 or NF E 10-022.